9.8kWh LG Chem Home Battery
9.8kWh LG Chem Home Battery
9.8kWh LG Chem Home Battery

9.8kWh LG Chem Home Battery

Vendor
LG
Regular price
$10,999.99
Sale price
$10,999.99

PLEASE contact us for ACCESS to 500 Solar Product Brands and 15,000 available solar products

Customer Service Questions, please contact 800-325-4914 or please email sales@redboxtoolsusa.com for any large orders or other questions

The LG Chem RESU10H is a 9.8 kWh home battery for daily cycle use that re-charges with electricity generated from PV solar panels or utility grid. The LG Chem Home Battery can provide safe power on-demand, or reliable backup if the power-grid goes down. LG Chem Home Battery is a wall or floor mounted, rechargeable lithium ion battery that is guaranteed by LG Electronics for 10 years. The LG Chem 400V high-voltage is compatible with many AC inverters available today including SolarEdge StorEdge or SMA Sunny Boy Storage. PARTS LIST - Product Features
  • Designed for daily use cycle applications
  • Automatically switch to battery power in the event of an electric company outage
  • Proven safety record in its automotive battery
  • Compact Size and Easy Installation, measures 9" deep and 3' all-around
  • Durable LG Chem technology ensures 80% of capacity retention after 10 years
  • Qualifies for 30% renewable energy tax credit discount when used with a Solar PV system
  • 10 year manufacturer warranty
  • Listed to UL standards UL1642, UL1973, TUV IEC62619, CE, FCC, RCM
  • Requires products sold separately including battery inverter, auto-transformer, and meter
  • Manufacturer: LG Chem
  • Model Part Number: RESU10H-R (SolarEdge), EVESPBO0100B0, RESU10H-C (SMA),
  • ELECTRICAL SPECIFICATIONS
  • Total Energy Capacity: 9.8 kWh (@ 77°F, 100% State of Energy)
  • Usable Energy Capacity: 9.3 kWh
  • Battery Capacity: 63 Ah
  • Voltage Range: Charge 400 to 450 Vdc; Discharge 350 to 430 Vdc
  • Absolute Maximum Voltage: 520 Vdc
  • Maximum Current: Charge 11.9A @ 420Vdc; Discharge 14.3A @ 350Vdc
  • Recommended Charge/Discharge Power: 3.5kW for maximizing battery lifetime
  • Maximum Charge/Discharge Power: 5kW
  • Peak Power Discharge: 7kW for 10 seconds
  • Peak Current Discharge: 18.9A @ 370 Vdc for 10 seconds
  • Communication Interface: RS485
  • DC Disconnect: Circuit Breaker
  • Connection Method: Spring type connectors
  • User Interface: LEDs for normal and fault operation
  • ENVIRONMENTAL SPECIFICATIONS
  • Operating Temperature Range: -20C (-4F) to +50C (+122F)
  • Humidity:
  • Maximum Altitude: 9,843 ft (3,000 m)
  • Enclosure: IP55, Rated for indoor and outdoor installation
  • Impact Rating:
  • Storage Conditions:
  • 24 hours: -30 °C to 60 °C (-22 °F to 140 °F)
  • 1 Month: -20 °C to 45 °C (-4 °F to 113 °F)
  • 12 Months: -20 °C to 30 °C (-4 °F to 86 °F), State of Energy (SoE): 50% initial
  • MECHANICAL SPECIFICATIONS
  • Dimensions H x W x D: 35.70 x 29.30 x 8.10 inches
  • Weight: 220 lbs
  • MINIMUM SPACE REQUIREMENTS
  • Floor or wall mounted, Indoor or outdoor
  • Total ceiling height: TBD ft ( mm)
  • Height - Clearance above: TBD ft ( mm)
  • Height - Clearance below: TBD ft ( mm)
  • Lateral - Wall space: TBD in ( mm)
  • Lateral - Clearance from each side: TBD in ( mm)
  • Depth of workspace: TBD in ( mm)
  • WARRANTY AND OTHER SPECIFICATIONS
  • Warranty: 10 years
  • Inverter: Compatible with AC inverters from SolarEdge, Outback Power, SMA
  • LG reserves the right to make product modifications at any time
  • RedBoxToolsUSA is not responsible for ERRORS OR OMISSIONS
  • Proper disposal of batteries is required. Refer to your local codes for disposal requirements.

PV Solar with LG Chem Battery System Diagram

View the schematic below to see the components included in a PV solar system with LG Chem home battery.

LG Chem Battery System Diagram


LG Chem Residential Storage (RESU) Battery Introduction

 

 


LG Chem RESU Battery Installation Video

 

 


LG Chem Battery Installation Instructions

Read the entire INSTALLATION AND USER’S MANUAL document before installing or using the battery. Failure to do so or to follow any of the instructions or warnings can result in electrical shock, serious injury, or death, or can damage the battery, potentially rendering it inoperable.

  • STEP 1 - REMOVE THE PALLET
  • STEP 2 - DETERMINE THE MOUNTING LOCATION FOR BATTERY
  • STEP 3 - INSTALL THE WALL MOUNT BRACKET
  • STEP 4 - MOUNT BATTERY
  • STEP 5 - REMOVE THE PACKAGING
  • STEP 6 - REMOVE THE BOTTOM COVER
  • STEP 7 - REMOVE THE SPLASH COVER
  • STEP 8 - SET THE CONFIGURATION SWITCHES
  • STEP 9 - SET THE ADDRESS SWITCHES
  • STEP 10 - PREPARE THE WIRING
  • STEP 11 - FEED WIRES THROUGH THE CONDUIT PLATE OR CABLE GLAND
  • STEP 12 - CONNECT THE WIRING
  • STEP 13 - CONNECT MULTIPLE BATTERY TOGETHER
  • STEP 14 - CONNECT POWERWALL TO THE INVERTER
  • STEP 15 - ATTACH THE SIDE COVERS
  • STEP 16 - ATTACH THE SPLASH COVER
  • STEP 17 - ATTACH THE BOTTOM COVER
  • STEP 18 - REPACK THE SHIPPING BOX

TOOLS REQUIRED to install LG CHEM Battery

  • Wall mount bracket fasteners
  • Note: The details below are only guidance and are not guaranteed to be applicable. Consult local building codes and a structural engineer to ensure the use of appropriate fasteners.
    • Minimum of 6 fasteners, stainless steel, diameter 10 mm (3/8 in)
    • Fastener head clearance for all positions but two bottom outer holes: 18 mm (11/16 in)
    • Fastener head clearance for bottom two holes at 600 mm (24 in) spacing: 8 mm (5/16 in)
    • Washers between fastener heads and wall mount bracket are recommended
  • Drill and a drill bit suitable for drilling pilot holes in the desired mounting surface
  • Socket wrench
  • 10 mm socket adapter (for covers and wall mount bracket side tabs)
  • 17 mm socket adapter (for wood block bolts)
  • Large flathead screwdriver (for ground lug)
  • Optional: small flathead screwdriver (for wiring terminal tabs)
  • T20 Torx (for splash cover)
  • T25 Torx (for screws fastening box to wood blocks)
  • T30 Torx (for packaging L-bracket and conduit/gland plate)
  • Torque wrench
  • Stud finder (for wood installations)
  • Level tool
  • Painter's tape and/or pencil
  • Wire stripper and wiring (as described in Step 10)
  • Conduit fitting or cable gland (as appropriate)
  • Lift tool or adequate personnel trained and capable of lifting 220 lbs from ground level to approximately chest height. Warning: LG Chem battery is heavy and challenging to lift. Lift equipment is recommended.
  • To prevent injury, wear work boots (preferably steel-toed), long pants, and gloves.